KATHMANDU: Traffic services have resumed on the BP highway following the repair of road sections damaged by flooding in the Roshi river due to incessant rainfall. The highway had been blocked after the river eroded sections in the Piple and Gimdibesi areas.
Authorities cleared the route by performing back-cutting work in the affected areas, allowing traffic to resume this evening. Infrastructure Development Minister Sunil Lamsa confirmed that the road section is now operational. Minister Lamsa further stated that roads across the country that were previously blocked due to cyclone Arnab have also been fully reopened. The restoration of these routes is expected to facilitate easier travel for passengers and vehicles.
